Tesoro Viejo Bridges 

American Paving Co. was selected to construct key bridges for the Tesoro Viejo Development with McCaffrey Homes, including 9 vehicular bridges, 2 pedestrian bridges, and 2 temporary vehicular bridges. Construction began in August 2017 with temporary rail car bridges across the Madera Canal, paving the way for permanent Con-Span bridges on Treasure Hills Drive and […]

Barstow Avenue Class IV Bikeway Project

The Barstow Avenue Class IV Bikeway Project bid in January 2023. APC provided the second lowest bid, but the City of Fresno rejected the low bidder due to an incorrect bid bond. The $2.23M project was awarded to APC a few months later. The project included reconstruction of the pavement on Barstow Avenue for one […]

Tegner Road Over Turlock Irrigation District Lateral No. 5 Bridge Replacement

The Tegner Road Over Turlock Irrigation District Lateral No. 5 Bridge Replacement Project, located southwest of Turlock in Stanislaus County, involved replacing a critical canal bridge at a busy intersection surrounded by farmland. Bid in July 2018 and launched in November 2018, The project required maintaining heavy traffic flow throughout construction. American Paving Co. implemented […]

Betty Drive/Avenue 312 Realignment and Improvement Project, Phase 2B

The project consists of realignment and widening of Betty Drive from a 2-lane to a 4-lane roadway from State Route 99 to Robinson Road. Work includes construction of a new concrete box girder bridge (320 ft. long by 88 ft. wide) over the railroad, earthwork, storm drainage, retaining wall, sound wall, traffic signals, street lighting, […]

Crane Valley Dam Seismic Retrofit Project

The initial phase of the project included overlaying Road 222 to increase the structural section of the roadway. The increased structural section will minimize the damage to the existing roadway from large trucks carrying rocks for construction of the dam. Upon completion of the import operation APC performed a grind/overlay on Road 222. Other areas […]

Jensen Avenue Overhead Rehabilitation and Seismic Retrofit

This project consisted of rehabilitation and seismic retrofit of an approximately 650 foot long grade separated structure over the Union Pacific and Burlington Northern Santa Fe railroads as well as two city streets. The work on top of the structure included replacement of barrier rails, approach slabs, polyester concrete overlay, minor concrete improvements and asphalt […]

Construction on State Highway in Monterey County

This project consisted of placing a polyester concrete overlay, treating bridge decks with methacrylate, approach slab removal and replacement, and joint seal replacements. This work was performed at seven different locations: three near King City on Hwy 101 and four near Monterey on Hwy 1. All work was performed at night due to traffic control […]

Construction of Road 28 Bridge Replacementat Cottonwood Creek

The project consisted of removing an existing 22-foot wide by 200-foot long bridge over Cottonwood Creek that was built in 1921. American Paving Co. then replaced the existing bridge with a reinforced 16-inch thick flat concrete slab bridge measuring 212 feet 10 inches long and 35 feet 6 inches wide. The bridge was supported by […]

Road 36 Culvert Replacement

Removal of existing timber culvert and construction of a new concrete culvert. Removal and replacement of a portion of Road 36 with striping and guard rails.