Job Details

Project Type: Transportation

Location

Shaver Lake, California

Completion Date

October, 2008

Owner

Southern California Edison Hydro Northern – Services Generation

55481 Poplar Road Big Creek, CA 93605

Owner Contact:

Jim Hair, Project Inspector

(909) 747-5826

451 Clovis Avenue Suite 200 Clovis, CA 93612

Engineer Contact:

David Mowry

(559) 326-1400

American Paving Co.

Jimmy Brager, P.M.

(559) 268-9886

Contact for Services

Have a project in mind? Reach out to American Paving Co. today for a free estimate or to learn more about our services. We’re here to help—no job is too big or small.

Eastwood Power Station Access Road

Overview :

Demolition of existing concrete curb; clear and grub; grind and overlay 3.1 miles of existing asphalt concrete; and traffic striping.