Job Details

Project Type: Education

Location

Fresno, California

Completion Date

February 2013

Owner

Fresno Unified School District

Rick Diaz

Owner Contact:

(559) 457-3070

Darden Architects, Inc.

Engineer Contact:

Robert Petithomme

(559) 448-8051

American Paving Co.

Tim McLaskey, P.M.

Contact for Services

Have a project in mind? Reach out to American Paving Co. today for a free estimate or to learn more about our services. We’re here to help—no job is too big or small.

Edison High School Academic Organization Building

Overview :

The project consisted of multiple mobilizations to complete 7,702 CY of cut to fill and overexcavation and 1,185 CY of import borrow to construct the building pad for the two story Academic Organization Building. In addition, American Paving Co. completed placing, compacting, and finishing of the aggregate base rock and asphalt concrete for the project along with provide SWPPP compliance and inspections for the duration of the project. Challenges with constructing this project included a small project footprint located at an existing facility, multiple trades working at the same time, tight paving areas, and an accelerated schedule to insure completion of the project for the spring semester.